Where to expect traffic delays in the days ahead
A4 West Cromwell Road
      11 October — 13 October
      Delays likely Lane closure
      Works description:Maintenance - BROKEN GULLY FRAME. Lane 1 
      Responsibility for works: Transport for London 
 Blythe Road 
      11 October — 16 October 
      Delays possible Some carriageway incursion 
      Works description: Boundary Box Exchange Fway in Footway. Our intention is to complete thePermanent Reinstatement in the same phase
      Responsibility for works:THAMES WATER
Blythe Road 
        12 October — 18 October 
        Delays possible Some carriageway incursion  
        Works description: Connections Highway Services:Works on behalf of local authority (Works For Road Purposes) :Column Connection Scheme on behalf of LBHF
      Responsibility for works: Hammersmith and Fulham 
 A219 Fulham Palace Road
      12 October — 17 October 
      Delays possible Some carriageway incursion  
      Works description: Arqiva 5G excavate fw to install new duct 
      Responsibility for works: CITYFIBRE METRO NETWORKS LTD
      
402 Goldhawk Road
      12 October — 17 October
      Delays likely Traffic control (multi-way signals) 
      Works description: DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. 
      Responsibility for works: Openreach 
Information supplied by roadworks.org
| 
 |