Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead  
        
          |  |  
          | 
              
                | A219 Fulham Palace Road, London, Hammersmith And Fulham |  
                | 05 January — 11 January Lane closure |  |  |  
                | Delays likely due to StreetworksNetwork Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement 2016 at A219
 |  |  |  
                | Responsibility: UK Power Networks |  |  |  
                | EToN status: Planned work about to start |  |  
        
          |  |  
          | 
              
                | A4 Talgarth Road, London, Hammersmith And Fulham  |  
                | 08 January — 10 January Lane closure  |  |  |  
                | Delays likely due to StreetworksRepair To A Damaged Water Main In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A4
 |  |  |  
                | Responsibility: Thames Water  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  
        
          | A402 Goldhawk Road, London, Hammersmith And Fulham  |  
          | 08 January — 14 January Lane closure  |  |  |  
          | Delays likely due to StreetworksLay New Domestic Service 5m From Main In Carriageway at A402
 |  |  |  
          | Responsibility: National Grid Gas Plc  |  |  |  
          | EToN status: Planned work about to start  |  |  |  
          |  |  |  |  
        
          |  |  
          | 
              
                | A219 Shepherd'S Bush Road, London, Hammersmith And Fulham  |  
                | 08 January — 12 January Some carriageway incursion  |  |  |  
                | Delays possible due to StreetworksMain Clamp In Footway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase at A219
 |  |  |  
                | Responsibility: Thames Water  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  
          |  |  
          |  |  
          |  |  
          | 
              
                | A315 King Street, London, Hammersmith And Fulham  |  
                | 07 January — 11 January Some carriageway incursion  |  |  |  
                | Delays possible due to StreetworksComplete Remedial Works In Footway at A315
 |  |  |  
                | Responsibility: Fulcrum Pipelines Limited  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  
          |  |  
          | 
              
                | A315 King Street, London, Hammersmith And Fulham  |  
                | 08 January — 12 January Some carriageway incursion  |  |  |  
                | Delays possible due to StreetworksS81 Cover Replacement - Works Intended To Include First Time Permanent Within Same Phase at A315
 |  |  |  
                | Responsibility: Thames Water  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  
          |  |  
          | 
              
                | A3218 Lillie Road, London, Hammersmith And Fulham  |  
                | 07 January — 11 January Some carriageway incursion  |  |  |  
                | Delays possible due to StreetworksConnections Small Service:Disconnection: (Approx Depth 450mm):Disconnect Existing Supply at A3218
 |  |  |  
                | Responsibility: UK Power Networks  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  
          |  |  
          |  |  
          |  |  
          | 
              
                | A3220 Holland Road, London, Kensington And Chelsea  |  
                | 07 January — 07 January Some carriageway incursion  |  |  |  
                | Delays possible due to StreetworksHorts - Tree Pruning Part Fw And Part Lane 2 at A3220
 |  |  |  
                | Responsibility: Transport For London  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  
          |  |  
          | 
              
                | A3220 Holland Road, London, Kensington And Chelsea  |  
                | 07 January — 08 January Some carriageway incursion  |  |  |  
                | Delays possible due to StreetworksMaintenance: Failed Patch/Cracking Around 2 Metal Covers Part Lane 1 And Bay Suspended at A3220
 |  |  |  
                | Responsibility: Transport For London  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  
          |  |  
          | 
              
                | A3220 Holland Road, London, Kensington And Chelsea  |  
                | 08 January — 08 January Some carriageway incursion  |  |  |  
                | Delays possible due to StreetworksCpp - Horts - Tree Pruning Part Fw And Part Lane 2 at A3220
 |  |  |  
                | Responsibility: Transport For London  |  |  |  
                | EToN status: Planned work about to start  |  |  |  
                |  |  |  |  |  January 8, 2016           
 Information supplied by Roadworks.org   
        January 8, 2016
         |