Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead  Road closures underneath Hammersmith Flyover  Centre Access RoadRoad closure, 10.30pm - 5am,   18 September
 Eastern Access RoadRoad closure, 10.30pm - 5am,   18 Sept
 Emergency works on Hammersmith Bridge   Closed southbound from 8am to 4pm daily, from Monday 21 September to Friday 25 September.    
        
          |  |  
          | 
              
                | A315 Hammersmith Road, London, Hammersmith And Fulham |  
                | 19 September — 21 September Lane closure |  
                | Delays likely due to Streetworks Repair To A Damaged Network Valve In Carriageway. Our Intention Is To Complete The Permanent Reinstatement In The Same Phase at A315
 |  
                | Responsibility: Thames Water |  
                | EToN status: Planned work about to start |  
                |  |  |  
          |  |  
          | 
              
                | A4 Talgarth Road, London, Hammersmith And Fulham |  
                | 18 September — 20 September Lane closure |  
                | Delays likely due to Streetworks Repair To A Damaged Thames Water Main In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A4
 |  
                | Responsibility: Thames Water |  
                | EToN status: Planned work about to start |  
                |  |  |  
          |  |  
          |  |  
          |  |  
          | 
              
                | A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |  
                | 18 September — 22 September Some carriageway incursion |  
                | Delays possible due to Streetworks Service Pipe Repair In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219
 |  
                | Responsibility: Thames Water |  
                | EToN status: Planned work about to start |  
                |  |  |  
          |  |  
          |  |  
          |  |  
          | 
              
                | A3220 Addison Road, London, Kensington And Chelsea |  
                | 18 September — 19 September Some carriageway incursion |  
                | Delays possible due to Streetworks Maintenace: Relay- 8 Uneven 600 Slabs Area 2.88m Sq. Part F/W Part Lane 1 at A3220
 |  
                | Responsibility: Transport For London |  
                | EToN status: Planned work about to start |  
                |  |  |  
          |  |  
          | 
              
                | A3220 Holland Road, London, Kensington And Chelsea |  
                | 18 September — 19 September Some carriageway incursion |  
                | Delays possible due to Streetworks Maintenace: 10/15 Broken Paving Slabs. Part F/W Part Lane 1 at A3220
 |  
                | Responsibility: Transport For London |  
                | EToN status: Planned work about to start |  
                |  |  |  
          |  |  
          | 
              
                | A4020 Uxbridge Road, London, Hammersmith And Fulham |  
                | 18 September — 22 September Some carriageway incursion |  
                | Delays possible due to Streetworks W.R.P. - Remove Non Ad Bus Shelter, Back Of Path, For And On Behalf Of Transport For London- 0113/1011 2323356 at A4020
 |  
                | Responsibility: London Transport |  
                | EToN status: Planned work about to start |  
                |  |  |  
          |  |  
          | 
              
                | A4020 Uxbridge Road, London, Hammersmith And Fulham |  
                | 19 September — 22 September Some carriageway incursion |  
                | Delays possible due to Streetworks Customer Connection New Residential Supply & Clear Blockages If Found. Footway Works Only at A4020
 |  
                | Responsibility: Virgin Media |  
                | EToN status: Planned work about to start |  
                |  |  |  
          |  |  
          |  |  
          |  |  
          |  |  
          |  |  
          |  |  
          |  |  
          |  |            
 Information supplied by Roadworks.org   
        September 18, 2015
         |