Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead  
        
          | 
              
                | A3218 Lillie Road, London, Hammersmith And Fulham |  
                | 11 July — 17 July Traffic control (multi-way signals) |  
                | Delays likely due to Streetworks Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement at A3218
 |  
                | Responsibility: UK Power Networks |  
                | EToN status: Planned work about to start |  |  
          |  |  
          |  |  
          |  |  
          | 
              
                | A402 Goldhawk Road, London, Hammersmith And Fulham |  
                | 10 July — 14 July Some carriageway incursion |  
                | Delays possible due to Streetworks Boundary Box Remove In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A402
 |  
                | Responsibility: Thames Water |  
                | EToN status: Planned work about to start |  |  
          |  |  
          |  |      Information supplied by Roadworks.org    
         |