Forthcoming Roadworks in the Ealing Area
Closures and diversions which may cause problems

Madeley Road, Ealing |
15 July — 24 July |
Delays likely Traffic control (two-way signals) |
Works description: MAINS RENEWAL WORKS ON BEHALF OF THAMES WATER - FW/CW WORKS |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU821H553/MBEL05/I001 |
A406,A40 Western Avenue, Ealing |
25 July — 26 July |
Delays likely Road closure |
Works description: CYCLICAL ROUTINE MAINTENANCE, FULL CLOSURE AND DIVERSIONS |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG431383159 |
A4020 Uxbridge Road, Hanwell |
22 July — 26 July |
Delays likely Contra-flow |
Works description: NHHBW,L/A 31,P1,1x25mm MDPE mtrd Supply in in Footway. Our intention isto complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000808457120135-001 |
|
B4491 Popes Lane, Ealing |
22 July — 24 July |
Delays likely Traffic control (two-way signals) |
Works description: Excavation - Civils team to excavate a 1m by 1m trial dig to identify if the area is suitable for a new telecommunications pole to be installed. 5G! 2-way lights in place. |
Responsibility for works: T-Mobile (UK) Limited |
Current status: Planned work about to start |
Works reference: YN110EAL007-PGN/ERF |
|
Gordon Road, West Ealing |
22 July — 24 July |
Delays likely Traffic control (multi-way signals) |
Works description: Serv Pipe Relay Ex Fitting Sz P Cway & Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031097913-004 |
|
A4020 The Mall, Ealing |
20 July — 19 August |
Delays likely Lane closure |
Works description: road crossing and 15 meters trench work. 12 x 1.5 jointhole and 3 x 1.5 joint hole. 14 mtrs rx |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30003229 |
|
Madeley Road, Ealing |
17 June — 01 September |
Delays likely Traffic control (two-way signals) |
Works description: Highway improvement scheme |
Responsibility for works: Ealing |
Current status: Advanced planning |
Works reference: DV00665000819 |
|
B455 South Ealing Road, Ealing |
10 June — 22 October |
Delays likely Traffic control (multi-way signals) |
Works description: IMGA202336. Replace approximately 1179metres of 14in Cast IronLowPressure gas main with new 355mm PE main by means of insertion.This will include several connections and all services on the street. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000838110 |
A406 Gunnersbury Avenue (north Circular Road) |
01 May — 31 August |
Delays likely Lane closure |
Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Advanced planning |
Works reference: LP705S30001055 |
|
A4000, A40 Western Avenue, Acton |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342348 |
|
Westway, Hammersmith and Fulham |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342350 |
|
July 24, 2019
|