Forthcoming Roadworks in the Ealing Area
Closures and diversions which may cause problems
A4020 The Mall, Ealing |
03 July — 03 July |
Delays likely Traffic control (two-way signals) |
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141GTHG--000003 |
|
A4020 Uxbridge Road, Hanwell |
01 July — 03 July |
Delays likely Traffic control (multi-way signals) |
Works description: 1X JOINT HOLE AND 3M OF TRENCH |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30002737 |
|
A406,A40 Western Avenue, Ealing |
01 July — 03 July |
Delays likely Lane closure |
Works description: 27/004 tel0227962 - slot cut c/w sensor loops to repair traffic signals SD3 & SD4 repair feeder plus feed to existing chamber, 22.00-05.00, westbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained) |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG516S000000004882 |
|
A406 North Circular Road, Park Royal |
02 July — 03 July |
Delays likely Traffic control (multi-way signals) |
Works description: DESILT PIT IN FOOTWAY FOR CUSTOMER CONNECTION |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJBU/109121/LB17 |
|
B452 Northfield Avenue, West Ealing |
02 July — 04 July |
Delays likely Traffic control (Stop/Go boards) |
Works description: 27/020 (STREAM 27/172) - 111032 - slot cut c/w sensor loops to repair traffic signals SD4 repair feeder plus feed to existing chamber, 10.00-15.00, northbound c/w lane 1 and f/w to chamber (ped access maintained) |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG515S000000002338 |
|
Madeley Road, Ealing |
02 July — 03 July |
Delays likely Traffic control (multi-way signals) |
Works description: DESILT PIT IN FOOTWAY FOR CUSTOMER CONNECTION |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJBU/109121/LB16 |
|
Pitshanger Lane, Ealing |
02 July — 02 July |
Delays likely Traffic control (multi-way signals) |
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141GZYN--000001 |
|
A4020 Broadway, West Ealing |
26 June — 04 July |
Delays likely Lane closure |
Works description: Excavation in footway for electricity disconnection. Backfill & reinstate. |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30003174 |
|
B4491 Popes Lane, Ealing |
26 June — 03 July |
Delays likely Traffic control (multi-way signals) |
Works description: lay new gas main and services approx 3.1m in f/w and 0.84m in c/way |
Responsibility for works: Fulcrum Pipelines Limited |
Current status: Planned work about to start |
Works reference: WY001NSA23259 |
|
Madeley Road, Ealing |
17 June — 01 September |
Delays likely Traffic control (two-way signals) |
Works description: Highway improvement scheme |
Responsibility for works: Ealing |
Current status: Advanced planning |
Works reference: DV00665000819 |
|
B455 South Ealing Road, Ealing |
10 June — 22 October |
Delays likely Traffic control (multi-way signals) |
Works description: IMGA202336. Replace approximately 1179metres of 14in Cast IronLowPressure gas main with new 355mm PE main by means of insertion.This will include several connections and all services on the street. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000838110 |
A406 Gunnersbury Avenue (north Circular Road) |
01 May — 31 August |
Delays likely Lane closure |
Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Advanced planning |
Works reference: LP705S30001055 |
|
A4000, A40 Western Avenue, Acton |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342348 |
|
Westway, Hammersmith and Fulham |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342350 |
|
July 2, 2019
|