Forthcoming Roadworks in the Ealing Area


Closures and diversions which may cause problems

Forthcoming Roadworks in The Ealing Area

A406 Gunnersbury Avenue, Ealing

06 June — 07 June

Delays likely Lane closure

Works description: FOOTWAY REPAIRS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430387260

A406 Gunnersbury Avenue (north Circular Road)

04 June — 13 June

Delays likely Lane closure

Works description: Phase 5 - 8 Surfacing Works - S58 required

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG432351166

A406,A4005 Hanger Lane, Ealing

06 June — 08 June

Delays likely  Traffic control (two-way signals)

Works location:  Unknown

Works description:  TfL speed camera works - RE-CUT LOOPS AND TERMINATE INTO EXISTING CABINET

Responsibility for works:  Transport for London

Current status:  Planned work about to start

Works reference:  YG504413446

B4491 Popes Lane, Ealing

28 May — 10 June

Delays likely Traffic control (multi-way signals)

Works description: lay new gas main and services approx 3.1m in f/w and 0.84m in c/way

Responsibility for works: Fulcrum Pipelines Limited

Current status: Planned work about to start

Works reference: WY001NSA22794

A406 Gunnersbury Avenue (north Circular Road)

01 May — 31 August

Delays likely Lane closure

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Advanced planning

Works reference: LP705S30001055

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

Westway,  Hammersmith and Fulham

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

 

June 5, 2019