Forthcoming Roadworks in the Ealing Area
Closures and diversions which may cause problems

A406 Gunnersbury Avenue, Ealing |
06 June — 07 June |
Delays likely Lane closure |
Works description: FOOTWAY REPAIRS |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430387260 |
|
A406 Gunnersbury Avenue (north Circular Road) |
04 June — 13 June |
Delays likely Lane closure |
Works description: Phase 5 - 8 Surfacing Works - S58 required |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432351166 |
|
A406,A4005 Hanger Lane, Ealing |
06 June — 08 June |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: TfL speed camera works - RE-CUT LOOPS AND TERMINATE INTO EXISTING CABINET |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG504413446 |
|
B4491 Popes Lane, Ealing |
28 May — 10 June |
Delays likely Traffic control (multi-way signals) |
Works description: lay new gas main and services approx 3.1m in f/w and 0.84m in c/way |
Responsibility for works: Fulcrum Pipelines Limited |
Current status: Planned work about to start |
Works reference: WY001NSA22794
|
A406 Gunnersbury Avenue (north Circular Road) |
01 May — 31 August |
Delays likely Lane closure |
Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Advanced planning |
Works reference: LP705S30001055 |
|
A4000, A40 Western Avenue, Acton |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342348 |
|
Westway, Hammersmith and Fulham |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342350 |
|
June 5, 2019
|