Forthcoming Roadworks in the Ealing Area
Closures and diversions which may cause problems

Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
A4020 The Mall, Ealing |
11 March — 12 March |
Delays likely Lane closure |
Works description: 27/018 tel0200657 - slot cut c/w sensor loops to repair traffic signals SD4 repair feeder plus feed to existing chamber, 20.00-05.00, westbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained) Bus Stop: 733 Suspension |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG516S000000004533 |
|
A4020 The Mall, Ealing |
13 March — 13 March |
Delays likely Traffic control (two-way signals) |
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141GTHG--000001 |
|
A406,A4005 Hanger Lane, Ealing |
11 March — 12 March |
Delays likely Traffic control (two-way signals) |
Works description: CARRIAGEWAY PATCHING REPAIRS |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG430364933 |
|
B4491,A4000 Gunnersbury Lane, Acton |
11 March — 13 March |
Delays likely Traffic control (two-way signals) |
Works description: Chamber Adjust Lrg Frame & Cover Cway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000030691574-002 |
|
B452 Northfield Avenue, West Ealing |
11 March — 19 March |
Delays likely Traffic control (Stop/Go boards) |
Works description: 1x joint hole |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30002735 |
|
Gunnersbury Gardens, Acton |
11 March — 13 March |
Delays likely Road closure |
Works description: Permit for TM purposes only - working with MU301000030691574-002 |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000030691574-1002 |
|
Lilac Gardens, Ealing |
11 March — 15 March |
Delays likely Road closure |
Works description: ALTER AND RELAY EXISTING GAS SERVICE 9M FROM MAIN IN THE FARSIDECARRIAGEWAY |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000782457 |
|
Madeley Road, Ealing |
12 March — 21 March |
Delays likely Traffic control (two-way signals) |
Works description: TRIAL HOLE WORKS ON BEHALF OF THAMES WATER - CW WORKS |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU821H083/MEAS05/I001 |
|
B455 South Ealing Road, Ealing |
04 March — 15 March |
Delays likely Traffic control (multi-way signals) |
Works description: Excavate and lay duct working on behalf of Vodafone |
Responsibility for works: Vodafone |
Current status: Planned work about to start |
Works reference: NX50219JHG254 |
|
A4000, A40 Western Avenue, Acton |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342348 |
|
Westway, Hammersmith and Fulham |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342350 |
|
A406 Gunnersbury Avenue (North Circular Road) |
21 January — 19 March |
Delays likely Contra-flow |
Works description: Phase 1a - 1f Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432343386 |
March 11, 2019
|