Forthcoming Roadworks in the Ealing Area
Closures and diversions which may cause problems 
 Nine Month Delay to Gunnersbury Avenue RoadworksPower Road bridge project lane closures to continue until autumn 2018
 
        
          | B4491 Little Ealing Lane, Ealing |  
          | 29 August — 04 September |  
          | Delays likely Traffic control (two-way signals) |  
          | Works description: new customer water supply 1x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase |  
          | Responsibility for works: THAMES WATER |  
          | Current status: Planned work about to start |  
          | Works reference: MU307000806690690045-001 |  
        
          | 
              
                | A4020 Broadway, West Ealing |  
                | 30 August — 31 August |  
                | Delays likely Traffic control (two-way signals) |  
                | Works description: PERM REINSTATEMENT IN THE CARRIAGEWAY |  
                | Responsibility for works: THAMES WATER |  
                | Current status: Planned work about to start |  
                | Works reference: MU026002141CNVY--000003 |  |  
          |  |  
          | 
              
                | A406,A40 Western Avenue, Ealing |  
                | 30 August — 02 September |  
                | Delays likely Road closure |  
                | Works description: CYCLICAL ROUTINE MAINTENANCE, FULL CLOSURE AND DIVERSIONS |  
                | Responsibility for works: Transport for London |  
                | Current status: Planned work about to start |  
                | Works reference: YG431270432 |  |  
              
                | 
                    
                      |  B452, B455 Argyle Road, West Ealing |  
                      |  13 August — 04 September  |  
                      |  Delays likely Traffic control (multi-way signals)  |  
                      |  Works description: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REHABILITATION SCHEME  |  
                      |  Responsibility for works: THAMES WATER  |  
                      |  Current status: Planned work about to start  |  
                      |  Works reference: MU821H553/MEAS08/Z001  |  |  
                | 
                    
                      |  B455 Haven Green, Ealing |  
                      |  13 August — 08 September  |  
                      |  Delays likely Lane closure  |  
                      |  Works description: IMGA172020 ABANDON 97M X 100MM DI MAIN AND INSERT 90MM PE ANDRELAYORTRANSFER SERVICES  |  
                      |  Responsibility for works: Cadent  |  
                      |  Current status: Planned work about to start  |  
                      |  Works reference: AZ0071000717302  |  |  
              
                | B452,B455 Argyle Road, West Ealing |  
                | 28 August — 31 October |  
                | Delays likely Road closure |  
                | Works description: Carriageway resurfacing, including some areas of carriageway reconstruction. |  
                | Responsibility for works: Ealing |  
                | Current status: Planned work about to start |  
                | Works reference: DV00665000536 |  
              
                | Hatfield Road, West Ealing |  
                | 31 August — 06 October |  
                | Delays likely Road closure |  
                | Works description: Carry out 12no Customer Service relays between the existing Water main and Property boundaries, as part of Thames Waters Lead Pipe Replacement Project |  
                | Responsibility for works: THAMES WATER |  
                | Current status: Planned work about to start |  
                | Works reference: MU276IA/AMP6/EAL/501 |    
            August 30, 2018
             
               |