A4001, A3002 Boston Road, Hanwell |
24 October — 26 October |
Delays likely Lane closure |
Works location: A4001,A3002 |
Works description: 27/029 - 102016 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd2 Repair Feeder Plus Feed To Existing Chamber, 10.00-15.00, Southbound C/W Swapping Lane 1 & 2 And F/W To Chamber (Ped Access Maintained) Should Be Completed On The First Day, But A Three Day Duration In Case Of Any Problems On Site |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
A4020 The Mall, Ealing |
24 October — 26 October |
Delays likely Traffic control (Stop/Go boards) |
Works location: A4020 |
Works description: W.R.P. - Upgrade Of 3 Bay Non Ad Bus Shelter, Centre Of Path, For And On Behalf Of Transport For London 0109/9377 2695318 |
Responsibility for works: London Transport |
Current status: Planned work about to start |
|
A4020 Uxbridge Road, Hanwell |
24 October — 26 October |
Delays likely Lane closure |
Works location: A4020 |
Works description: 27/029 - 102016 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd5 Repair Feeder Plus Feed To Existing Chamber, 10.00-15.00, Eastbound C/W Swapping Lane 1 & 2 And F/W To Chamber (Ped Access Maintained) Should Be Completed On The First Day, But A Three Day Duration In Case Of Any Problems On Site |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
A4020 Broadway, West Ealing |
26 October — 28 October |
Delays likely Traffic control (give & take) |
Works location: A4020 |
Works description: W.R.P. - Installation Of 3 Bay Non Ad Bus Shelter, Back To Kerb, For And On Behalf Of Transport For London 0109/0131 |
Responsibility for works: London Transport |
Current status: Planned work about to start |
|
|
A4020 Uxbridge Road, Hayes |
25 October — 03 November |
Delays likely Traffic control (give & take) |
Works location: A4020 |
Works description: Crossover Construction |
Responsibility for works: Hillingdon London Borough Council |
Current status: Planned work about to start |
|
|
A406,A40 Western Avenue, Ealing |
26 October — 28 October |
Delays likely Road closure |
Works location: A406,A40 |
Works description: Cyclical Routine Maintenance, Full Closure And Diversions |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
A40 Western Avenue, Northolt |
25 October — 26 October |
Delays likely Lane closure |
Works location: A40 |
Works description: Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
A40 Western Avenue, Perivale |
26 October — 27 October |
Delays likely Lane closure |
Works location: A40 |
Works description: Carriageway Patching + Drainage Remedial Works |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
B452 Drayton Green Road, West Ealing |
25 October — 26 October |
Delays likely Traffic control (two-way signals) |
Works location: B452 |
Works description: Valve Repack 0 To 6" Cway In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
Meadvale Road, Ealing |
09 October — 13 December |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
A4180,B455 Ruislip Road, Northolt |
16 October — 29 October |
Delays likely Traffic control (two-way signals) |
Works location: A4180,B455 |
Works description: Section 50 Licence - Sewer Connections For New Development In Rectory Park |
Responsibility for works: Ealing London Borough Council |
Current status: Planned work about to start |
A406,A4005 Hanger Lane, Ealing |
21 September — 01 November |
Delays likely Road closure |
Works location: A406,A4005 |
Works description: Hlg Resurfacing, Lining And Structures Lane Closures/ Slip Road Closures On Both N/B On Slip To Hlg And N/B Off Slip From Hlg Lane Closures/ Slip Road Closures On Both S/B On Slip To Hlg And S/B Off Slip From Hlg |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
A406,A40 Western Avenue, Ealing |
21 September — 01 November |
Delays likely Road closure |
Works location: A406,A40 |
Works description: Hlg Resurfacing, Lining And Structures Lane Closures/ Slip Road Closures On Both W/B On Slip To Hlg And W/B Off Slip From Hlg Lane Closures/ Slip Road Closures On Both E/B On Slip To Hlg And E/B Off Slip From Hlg |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
A406 Hanger Lane Roundabout, Ealing |
21 September — 01 November |
Delays likely Road closure |
Works location: A406 |
Works description: Hlg Resurfacing, Lining And Structures Multiple Inner And Outer Ring Lane Closures, Off Slip Closures And Road Closures |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
Twyford Abbey Road, Park Royal |
21 September — 01 November |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
|