| 
                       
                         
                           | A315 Chiswick High Road, Chiswick, London, Hounslow |  
                             | 13 September — 13 September |  
                             | Delays likely                                              Lane closure |  
                             | Works location:  Unknown |  
                             | Works description:  EXCAVATE IN C/W TO UNCOVER AND OVERHAUL CRITICAL TRUNK MAIN  VALVE, BACK FILL AND REINSTATE |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU277MV6943828-01 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A406 Gunnersbury Avenue, Ealing, Ealing |  
                             | 12 September — 13 September |  
                             | Delays likely                                              Traffic control (two-way signals) |  
                             | Works location:  Unknown |  
                             | Works description:  CLEAR BLOCKAGE IN FOOTWAY TO ALLOW CUSTOMER CONNECTION |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SCLJBU/119710/LBC |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A310 Twickenham Road, Isleworth, Hounslow |  
                             | 14 September — 15 September |  
                             | Delays possible                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  ROAD   CROSSING ACROSS TWICKENHAM ROAD FOR HIGH VOLTAGE SUPPLY TO NEW SCHOOL.   Two way PLS to be manually operated & C/way can be reinstated   minimum 1.0m wide full width from kerb to kerb straight across not at an   angle. |  
                             | Responsibility for works:  GAS TRANSPORTATION CO LTD |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  ZP011P-0093211/R5 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Broadway, Hanwell, Ealing |  
                             | 12 September — 18 September |  
                             | Delays possible                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  HH   PL1-5 5x25mm MDPE mtrd sply FOR NEW WATER SUPPLY IN FW AND   inCarriageway. Our intention is to complete the Permanent Reinstatement   inthe same phase |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU307000805029930055-001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A205 Chiswick High Road (north Circular Road), Chiswick, London, Hounslow |  
                             | 12 September — 16 September |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Works to repair or replace damaged apparatus link box or frame and cover |  
                             | Responsibility for works:  Scottish and Southern Power Distribution |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  LP551S30003591 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A3000 Wellesley Road, Chiswick, London, Hounslow |  
                             | 13 September — 17 September |  
                             | Delays unlikely                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Install   2m of 1 way poly duct in Footway,Locate and excavate 1  blockage in   existing duct,Provide 2 core drill(s) into jointbox or building |  
                             | Responsibility for works:  Openreach |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  BC006TI001LC500285484501 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A406 Gunnersbury Avenue, Ealing, Ealing |  
                             | 12 September — 14 September |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  FIT NEW TEE IN FOOTWAY TO ALLOW CUSTOMER CONNECTION |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SCLJBU/119685/LSM |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A406 Gunnersbury Avenue, Ealing, Ealing |  
                             | 13 September — 13 September |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Pedestrian   barriers required around telecoms cabinet to allow engineers access to   internal equipment. 1.2m to be left open for pedestrians at all times |  
                             | Responsibility for works:  O2 (UK) Limited |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MG080GBC-10791-HOP |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A4 Great West Road, Brentford, Hounslow |  
                             | 12 September — 13 September |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CPP   - HA_DR27 Diversion route and Lane 3,2 start taper due to closure of M4   Jct 1.  Diversion route via A4 Westbound to M4 Jct 2. HA_DR27 |  
                             | Responsibility for works:  Highways England |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  FN59349090 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Epworth Road, Isleworth, Hounslow |  
                             | 14 September — 17 September |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  NEW CUSTOMER CONNECTION - CLEAR BLOCKAGE IN FOOTWAY |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSSMRE/100305211 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Half Acre Road, Hanwell, Ealing |  
                             | 13 September — 17 September |  
                             | Delays unlikely                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Install 3m of 1 way poly duct in Footway,Provide 1 core drill(s) into  jointbox or building |  
                             | Responsibility for works:  Openreach |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  BC006TI001LC500285972200 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Knights Avenue, Ealing, Ealing |  
                             | 12 September — 16 September |  
                             | Delays unlikely                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  1 ,Install 1m of 2 poly ducts in Footway,Provide 2 core drill(s) into  jointbox or building |  
                             | Responsibility for works:  Openreach |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  BC006TI001LC500280854601 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Lionel Road North, Brentford, Hounslow |  
                             | 14 September — 17 September |  
                             | Delays unlikely                                              Traffic control (give & take) |  
                             | Works location:  Unknown |  
                             | Works description:  Interim to permanent |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSEMFI/100299046 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Rothschild Road, Chiswick, Ealing |  
                             | 14 September — 14 September |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSERRE/15316575-1 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | The Park, Ealing, Ealing |  
                             | 14 September — 15 September |  
                             | Delays unlikely                                              Traffic control (priority working) |  
                             | Works location:  Unknown |  
                             | Works description:  Service Pipe Repair <33mm Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU301000031208414-001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Wood Lane, Isleworth, Hounslow |  
                             | 14 September — 17 September |  
                             | Delays unlikely                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  remedial to corect reinatstement around  frame and cove 6 mm DBM |  
                             | Responsibility for works:  Openreach |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  BC006CT001LC500246618102 |  | 
                   
                     |  |