                           | A406 Gunnersbury Avenue (north Circular Road), London, Hounslow |  
                             | 15 March — 28 March |  
                             | Delays likely                                              Lane closure |  
                             | Works location:  Unknown |  
                             | Works description:  Works   to reinstate the eastern footway of the A406 Gunnersbury Avenue over   the Power Road Bridge.  Works will require a Lane 1 SB for a safety   zone.  Works coordinated with the Gunnersbury Safety Scheme Phase 1. TM   24/7 |  
                             | Responsibility for works:  Transport for London |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  YG400401676 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A406 Gunnersbury Avenue (north Circular Road), London, Hounslow |  
                             | 15 March — 29 March |  
                             | Delays likely                                              Lane closure |  
                             | Works location:  Unknown |  
                             | Works description:  Works   to reinstate the eastern footway of the A406 Gunnersbury Avenue over   the Power Road Bridge.  Works will require a Lane 1 SB for a safety   zone.  Works coordinated with the Gunnersbury Safety Scheme Phase 2. TM   24/7 |  
                             | Responsibility for works:  Transport for London |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  YG400402049 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | B363 St Johns Road, Isleworth, Hounslow |  
                             | 15 March — 17 March |  
                             | Delays likely                                              Traffic control (two-way signals) |  
                             | Works location:  Unknown |  
                             | Works description:  Excavate and install approx 6m new gas pipe. Comprising of approx 1m c/way and 5m f/way. E: 515764 N: 176078 |  
                             | Responsibility for works:  Fulcrum Pipelines Limited |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  WY001NSA00022358 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | M4 |  
                             | 14 March — 15 March |  
                             | Delays likely                                              Road closure |  
                             | Works location:  Slip Closure Westbound. |  
                             | Works description:  M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network. |  
                             | Responsibility for works:  Highways England |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  76259 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | M4 |  
                             | 15 March — 16 March |  
                             | Delays likely                                              Road closure |  
                             | Works location:  Slip Closure Westbound. |  
                             | Works description:  M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network. |  
                             | Responsibility for works:  Highways England |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  76259 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Bollo Lane, Acton, Ealing |  
                             | 14 March — 20 March |  
                             | Delays possible                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  1   x HX joint hole on the jnc of Bollo Lane and Enfield Rd. 1 x LV joint   hole on Bollo lane, O/S site entrance. 10m of footway in Enfield Road   Acton. |  
                             | Responsibility for works:  GAS TRANSPORTATION CO LTD |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  ZP011P-0094715/R4 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | M4 |  
                             | 14 March — 15 March |  
                             | Delays possible                                              Lane closure |  
                             | Works location:  Hardshoulder and Lane 1 Closure Westbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed. |  
                             | Works description:  M4 Jct 1 to Jct 2. Lane Closures Westbound for pier monitoring works. |  
                             | Responsibility for works:  Highways England |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  76182 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | M4 |  
                             | 15 March — 16 March |  
                             | Delays possible                                              Lane closure |  
                             | Works location:  Hardshoulder and Lane 1 Closure Westbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed. |  
                             | Works description:  M4 Jct 1 to Jct 2. Lane Closures Westbound for pier monitoring works. |  
                             | Responsibility for works:  Highways England |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  76182 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A310 Twickenham Road, Isleworth, Hounslow |  
                             | 15 March — 19 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Excavate to clear blockage in footway |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSEMBU/100275253 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A4001,A3002 Boston Road, Hanwell, Ealing |  
                             | 14 March — 13 May |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Temporary Structure Licence - Scaffolding |  
                             | Responsibility for works:  Ealing |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  DV008TS0416 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A406 Gunnersbury Avenue, Ealing, Ealing |  
                             | 14 March — 17 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  DISCONNECT 1 X 32MM PE GAS SERVICE FROM MAIN IN THE VERGE |  
                             | Responsibility for works:  Cadent |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  AZ0071000817481 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | A406 Gunnersbury Avenue, Ealing, Ealing |  
                             | 14 March — 20 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  DISCONNECT 1 X 32MM PE GAS SERVICE FROM MAIN IN THE VERGE |  
                             | Responsibility for works:  Cadent |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  AZ0071000813079 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | B454 Syon Lane, Isleworth, Hounslow |  
                             | 15 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  PERM REINSTATEMENT IN FOOTWAY |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU039NOT-195853 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | B455 Ealing Road, Brentford, Hounslow |  
                             | 14 March — 15 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CLEAR 3.5M BLOCAKGE IN FOOTWAY |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSEMFI/100274448 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | B455 South Ealing Road, Ealing, Ealing |  
                             | 16 March — 16 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF FOUND. FOOTWAY WORKS ONLY |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSERRE/14650510J03 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Boddington Gardens, Acton, Ealing |  
                             | 15 March — 19 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMEN |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU356002141GVSM--000001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Bollo Lane, Acton, Ealing |  
                             | 15 March — 19 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  REPLACE LIGHTING COLUMN |  
                             | Responsibility for works:  Ealing |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  DV806S000000000905 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Bramley Road, Ealing, Ealing |  
                             | 15 March — 19 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU356002141HFDX--000001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Brook Lane North, Brentford, Hounslow |  
                             | 16 March — 19 March |  
                             | Delays unlikely                                              Traffic control (give & take) |  
                             | Works location:  Unknown |  
                             | Works description:  INTERIM TO PERM |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSEMFI/100268164 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Burlington Road, Chiswick, London, Hounslow |  
                             | 14 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMEN |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU356002141GQKZ--000001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Commerce Road, Brentford, Hounslow |  
                             | 14 March — 15 March |  
                             | Delays unlikely                                              Traffic control (priority working) |  
                             | Works location:  Unknown |  
                             | Works description:  Remedial works to correct defect, 30m of hra needs to be dug out, as it is too shallow |  
                             | Responsibility for works:  Openreach |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  BC006TI001LC500260804501 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Elers Road, West Ealing, Ealing |  
                             | 14 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Water meter installation in footway |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU039NOT-212217 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Elers Road, West Ealing, Ealing |  
                             | 16 March — 16 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSERRE/14634007J3 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Hornbeam Crescent, Brentford, Hounslow |  
                             | 14 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU356002141GWWV--000001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Leighton Road, West Ealing, Ealing |  
                             | 15 March — 19 March |  
                             | Delays unlikely                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Ferrule Exchange Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU301000031191261-001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Loring Road, Isleworth, Hounslow |  
                             | 15 March — 19 March |  
                             | Delays unlikely                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  B Box Exchange in Footway. Our intention is to complete the PermanentReinstatement in the same phase |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU301000031254725-001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Loveday Road, West Ealing, Ealing |  
                             | 14 March — 18 March |  
                             | Delays unlikely                                              Some carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Serv   Pipe Relay Ex Fitting Sz P f/way and in Carriageway. Our intentionis to   complete the Permanent Reinstatement in the same phase |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU301000031253555-001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Mervyn Road, West Ealing, Ealing |  
                             | 16 March — 16 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY |  
                             | Responsibility for works:  VIRGIN MEDIA |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  NK100/SSERRE/14661687J3 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Overton Close, Isleworth, Hounslow |  
                             | 15 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  PERM REINSTATEMENT IN FOOTWAY |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU039NOT-203554 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Rothschild Road, Chiswick, Ealing |  
                             | 14 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  REPAIR LEAK IN FOOTWAY |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU356002141GXSH--000001 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Somerset Road, West Ealing, Ealing |  
                             | 14 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  Install   11m of 1 way poly duct in Footway,Install 1m of 1 way poly duct in   Verge,Provide 1 core drill(s) into jointbox or building |  
                             | Responsibility for works:  Openreach |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  BC006TI001LC500277079600 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Weston Road, Chiswick, Ealing |  
                             | 14 March — 15 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  WATER METER INSTALLATION IN FOOTWAY |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU039NOT-212740 |  | 
                   
                     |  | 
                   
                     | 
                         
                           
                             | Wood Lane, Isleworth, Hounslow |  
                             | 14 March — 18 March |  
                             | Delays unlikely                                              No carriageway incursion |  
                             | Works location:  Unknown |  
                             | Works description:  CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |  
                             | Responsibility for works:  THAMES WATER |  
                             | Current status:  Planned work about to start |  
                             | Works reference:  MU356002141HFXM--000001 |  | 
                   
                     |  |